Project Summary
Saulsbury completed all electrical and instrumentation construction for a crude oil terminal in Pecos, Texas. Our team installed the raceways, equipment, wiring, terminations, lighting, and instrumentation. Scope of the project also included:
- One crude tank
- Power distribution center (PDC)
- Meter skids (two inbound and one outbound)
- Truck loading
- Two – 700-horsepower mainline pumps with VFD
- Three – 200-horsepower booster pumps
- Two – 350-horsepower main pumps
- Two – 30-horsepower mixer motors
- Two – 7.5-horsepower instrument air compressors
- Two – 50-horsepower LACT charge pumps
- 400-kilowatt standby generator