Installation of Three Compressor Packages in Western Wyoming

Project Summary

Saulsbury installed a total of three Cat 3612 driven Ariel 4 throw compressor packages at two Brownfield locations for the client. This EPC project included:

  • Construction, engineering, and design of foundations and piping
  • Evaluation and modification of the existing MCC and power switching gear
  • Replacement of the primary station switches
  • Installation of additional MCC sections
  • Installation of pre-engineered spare slots
  • Expansion of generator buildings

The project was completed without interruption to ongoing operations and the tie-ins were managed to require a minimum station shutdown.